Eleven years, eleven case numbers, one table

Line up one building’s cleaning tenders year by year, read what “most advantageous tender, applied by analogy” and the tender period mean, then find the clauses that protect cleaners’ pay.

A warm-grey gouache corridor has a freshly mopped reflective floor, a cleaning trolley, closed doors, and an eleven-cell blank duty chart.

Early morning at the county government’s administration building. The corridor lights aren’t all on yet, and a mop has already been through once. The cleaning for this building is put out to tender once a year.

The video lays out the award notices from ROC years 105 to 115 (2016 to 2026), one year at a time. Across eleven service years, the same cleaning company won every time; in the last four, it was the only bidder each year. How do you build this table? And once it’s built, which part do you change so the people holding the mops aren’t the first to lose out?

The case number changes every year. The job doesn’t.

The cleaning contract is tendered once a year, so the case number is different every year. Year 105 is D104-1201-121-1; year 115 is E1141106-1. To connect them in the table, use three things: the case title, the performance period and the winning contractor’s code.

The year inside a case number is often one year earlier than the service year. E1121116-1 was published in year 112 and covers service in year 113. The year-105 case title gives no year, so read the performance period: “January 1, year 105 to December 31, year 105.” Check the winning contractor by its code. The way the name is written varies; the code stays stable. In year 106 the same case number first went unawarded and was then re-advertised, and the table records only the final award.

Once the table is built, the bidder-count column, from year 105 on, reads 4, 3, 4, 1, 3, 1, 2, 1, 1, 1, 1. The same company won in all eleven years. A single bidder appears 6 times in the eleven, but the only consecutive run is years 112 to 115, because year 111 had two. “Eleven years, the same company” and “four years, one bidder” are each a sentence drawn from a different column.

Limited tendering, with a string of words in front

The video points to five cases: the administration building for years 113, 114 and 115, plus the labor and youth department’s office building and Labor Park for years 113 and 114. Each notice gives the tendering method as “limited tendering after public selection or public solicitation,” under Article 22, Paragraph 1, Subparagraph 9 of the Procurement Act, which covers commissioning professional services and similar work from the winner of a public, objective selection. The award method reads “most advantageous tender, applied by analogy.” The five budgets total NT$18,740,000 and the awards NT$18,540,000. Every one had a single bidder.

Keep the words “by analogy.” A true most advantageous tender follows Articles 52 and 56. These five follow the Article 22 selection route and borrow the evaluation rules of the most advantageous tender. The procedures of the two routes have to be checked separately. Drop those words when copying the table, and you have written two routes as one.

Does cleaning count as a professional service? The Public Construction Commission’s letter No. 09400389510 of November 2, 2005 (ROC year 94) answered that the tendering agency decides for itself, based on the characteristics and actual needs of each case. The 9 new tenders found for cleaning the main government buildings of Kaohsiung, Tainan and Taitung also all applied the most advantageous tender by analogy. Other counties and cities use this selection method too.

The tender period counts from the day of the notice

Subtract the dates from notice to deadline and the five cases come to 10 to 12 days. The video asks: could another cleaning company understand the requirements, calculate staffing, plan shifts and write a service plan in ten days?

The statutory minimum is calculated under the Standards for Tendering Periods. All five are at or above the publication threshold but below the review threshold, so the baseline under Article 2 is 14 days. Article 4 applies Article 2 to public selection under Article 22, Paragraph 1, Subparagraph 9. All five offered electronic collection of tender documents, which under Article 9 cuts 3 days, leaving 11. Article 11 says the day of the notice counts, and the last day counts as a full day only if the deadline is at closing time. Counting the deadline day too, the five come to 11, 13, 11, 13 and 11 days, right along this line. If the deadline falls before closing time, the last day doesn’t count, and each loses a day.

Ten days alone can’t establish a violation; what can be said is that the time to prepare a bid sits near the minimum line. In the comparison group, Taitung gave 13 days in all three years, Tainan’s Yonghua offices 31 to 32 days, and Kaohsiung’s two new tenders 10 to 11 days. The room each place allows varies widely. Article 28 of the Procurement Act requires the tender period to be set as “a reasonable period,” and that is where the room to lengthen it lies.

Pay protection is in Article 8 of the model contract

The video says it could not find, for these five contracts, how many cleaners there are, how many hours they work or how their pay is protected. To know what to look for, read the model contract first.

The Public Construction Commission’s model service procurement contract, version of December 31, year 114, page 12, Article 8, Subparagraph 16: the monthly pay of stationed workers shall be more than 1.1 times the minimum wage, and if the total contract price is negotiated down, stationed workers’ pay is not adjusted with it. Page 7, Article 5, Subparagraph 8: payment claims must include proof that stationed workers have been paid. The monthly minimum wage for year 115 is NT$29,500; times 1.1, that is NT$32,450. That is the model contract’s basis for calculation; pay in an individual case depends on the actual contract. The model also comes in versions. In the version of November 24, year 112, the floor in the same place was still the basic wage, so older cases have to be checked against the version in force at the time.

The Ministry of Labor’s Reference Principles for Government Agencies and Institutions Using Service Contracting allow pay to be listed as a fixed cost under Point 4, Subparagraph 1, and Subparagraph 11 requires confirmation before payment that the contractor has paid wages as agreed.

The five sets of bidding instructions contain a checkbox for fixed payment of “dispatch” wages, and none of the five is checked. That box applies only to labor dispatch; for contracted stationed workers, the protection is written into the contract clauses. This empty box can’t tell you whether pay is protected.

Lock the price, then compare the service

Wesley says in the video that he held this one back for a long time: push a cleaning contract into price competition, and the first to be squeezed are the people who mop the corridors and clean the toilets every day. So the fix starts with procedure, and the price end gets locked first.

Article 12, Subparagraph 3 of the Regulations for Most Advantageous Tender Evaluation allows payment at a fixed price, with contractors competing on service quality. Articles 4 and 5 require the evaluation items and criteria to be stated in advance, and commitments on pay and benefits can be among them. The Public Construction Commission’s corporate social responsibility scoring template has an item that awards extra points in tiers by how many times the minimum wage the pay comes to. With the price fixed, there is no room to undercut.

The other matter is disclosure. Under Article 7, Paragraph 1, Subparagraph 8 of the Freedom of Government Information Act, written procurement contracts are information to be proactively disclosed. Article 18 allows personal data to be redacted and the rest disclosed as usual. Headcount, hours and pay-protection clauses can be requested; names and individual payslips aren’t on the list.

Go back to the year-by-year table and add one last column: what the pay clauses in that year’s contract say.

YOUR TURN

Your turn

  1. On the Government e-Procurement System, look up the cleaning tenders for your county or city government’s office building and lay out the last five years: service year, case number, number of bidders, tendering and award methods, and days from notice to deadline. Which column makes you want to ask questions first? Why?

    Show hint

    Read the service year from the case title and performance period. It is often one year later than the year in the case number. Check the winning contractor by contractor code.

  2. Using Articles 2, 4, 9 and 11 of the Standards for Tendering Periods, calculate the statutory minimum tender period for one case in your table and compare it with the actual number of days. If a new cleaning company is to have time to write a service plan, how many days would you recommend? Give your reasons.

    Show hint

    First confirm the procurement amount bracket and whether electronic collection of tender documents was offered. The day of the notice counts; for the last day, check whether the deadline is at closing time.

  3. Read Article 8, Subparagraph 16 of the Public Construction Commission’s model service contract and Point 4 of the Ministry of Labor’s contracting principles. Pick the two provisions you think a cleaning contract most needs, then list the fields you would ask the agency to disclose. Which item would you choose not to request, and why?

    Show hint

    Article 18 of the Freedom of Government Information Act allows part of a record to be redacted and the rest disclosed. Contract clauses and personal data are two different things.

SOURCES

Sources

  1. Government e-Procurement System award notice: E1141106-1, year-115 cleaning and maintenance services for the Pingtung County Government administration building (a verification code is required to open it) ↗
  2. Government e-Procurement System award notice: D104-1201-121-1, year-105 administration building cleaning (first row of the year-by-year table) (a verification code is required to open it) ↗
  3. Government e-Procurement System award notice: E1131205-2, year-114 cleaning and maintenance for the labor and youth department office building and Labor Park (a verification code is required to open it) ↗
  4. Government e-Procurement System tender search ↗
  5. Government Procurement Act, Article 22 (limited tendering, Paragraph 1, Subparagraph 9) ↗
  6. Standards for Tendering Periods (Articles 2, 4, 9, 11) ↗
  7. Regulations for Most Advantageous Tender Evaluation (Articles 4, 5, 12) ↗
  8. Public Construction Commission model service procurement contract, all versions (December 31, year 114 version, page 12, Article 8, Subparagraph 16) ↗
  9. Ministry of Labor: Reference Principles for Government Agencies and Institutions Using Service Contracting (Point 4) ↗
  10. Ministry of Labor announcement: monthly minimum wage of NT$29,500 for year 115 ↗
  11. Freedom of Government Information Act (Articles 7, 18) ↗

Bring a year-by-year table you’re halfway through. We can decide together what the next column should be.

How one-on-one sessions work