Scroll down an award notice and you reach a short field: number of bidders, 1.
Copy Pingtung County Government’s openly competed tenders from ROC year 114 (2025) one by one, and 565 of the 958 stop at that number. Close to six in ten.
The number is tidy. What it hasn’t said yet is whether those 565 ones are the same kind of one.
Put 565 back into a table first
Here is the scope: award notices issued by the county’s departments and bureaus in year 114, openly competed, with a single winner and complete notice dates. That makes 958 cases, each read for its bidder count. 565 divided by 958 is about 59%. The video description also cites 52% for February through August of year 115. That is a different period with a different denominator. Write the two ratios side by side, and don’t average them.
To redo it yourself, start at the tender search on the Government e-Procurement System. Enter Pingtung County Government as the agency, switch to the award search, then open the notices one at a time. Copy seven fields for each: case number, tendering method, announcement transmission count, notice date, bid deadline, number of bidders and procurement value bracket.
For “number of bidders,” read that box and nothing else. The number of winners, the length of the vendor list and the number of qualified bidders are separate fields, and they count different things.
Fill in twenty cases and sort by bidder count. The outline appears: what the rows with a 1 look like in every other column.
One 1, three ways to get there
The video borrows a doctor’s method. A doctor who sees a fever doesn’t name the illness on the spot. The doctor lists a few candidates, then asks what other symptoms each one would leave. A single bidder has at least three explanations.
One: the job really is hard. Few firms can do it in the first place. Think of a metro line, where the same handful of big construction companies compete. The traces: a large contract, demanding specs, and in other counties the same kind of tender draws just as few bidders.
Two: the law allows it. If the first opening fails because fewer than three firms bid, a second round can be awarded with just one. The trace: the same case number has an earlier failed round.
Three: the video calls it “someone knew first.” Its traces come as a set: a technically simple job, a tender period squeezed to the minimum, a newly founded company winning, while the same kind of tender in the next county draws many bidders.
Each explanation needs different columns. The first looks at value and procurement category. The second looks at the tender round. The third needs the tender period, the winner’s founding date and a cross-county comparison, read together. Look up the founding date by company name in the Ministry of Economic Affairs company registration database.
Whatever column your table is missing, the explanation only that column could rule out stays on the table.
Separate first rounds from second rounds
The second explanation comes from Article 48 of the Government Procurement Act. Paragraph 1 says that when three or more qualified suppliers bid, the bids shall be opened and the contract awarded. Paragraph 2 says that when a first opening fails for lack of three bidders, the tender period for the second round may be shortened, and the three-bidder limit need not apply.
Article 55 of the Act’s Enforcement Rules places “three or more qualified suppliers bidding” in the context of an agency running an open tender. So read the tendering-method column first. Only open tenders follow the Article 48 path. A restricted tender run through public evaluation goes before an evaluation committee, and another piece covers the arithmetic at that table.
To tell which round it is, check two places. The tender notice carries an “announcement transmission count,” and 01 marks the first tender notice for that case number. If the number is above 01, go back to the earlier no-award notice for the same case number and read whether the stated reason was a failed tender.
Then split the 565 into two piles: those with an earlier failed round, and those awarded to a single bidder on the first try. The second explanation can only account for the first pile.
Two explanations, one tender period
The video’s example is the Artisan District operations and management services contract, case number E1150212-1, NT$2 million, 12 days from notice to deadline, one bidder. The video says it plainly too: the tender period has a legal minimum, and the county broke no law.
Those 12 days are calendar days from notice date to deadline, holidays included. To check them against the legal minimum, open the Tender Period Standards. Article 2 sets four tiers by value: 7 days below the announcement threshold, 14 days from the announcement threshold up to the supervision threshold, 21 days from the supervision threshold up to the large-sum threshold, and 28 days for large-sum procurements. Article 4 applies the same four tiers to public evaluations. Article 9 cuts 5 days for cases that held a public inspection of documents before tendering, 3 days when the notice states that tender documents can be collected electronically, and 2 more for electronic bidding. Article 11 sets the count: the notice date counts as one day, and the deadline counts as a day only if bids close at the end of office hours.
A short tender period serves the third explanation, and the second as well. Article 48, paragraph 2 lets a second round shorten the tender period. Article 8 of the Tender Period Standards also lets a case re-tendered within three months of a failed tender, with no major change to the documents, be shortened as appropriate with reference to the days announced the first time.
So before reading the tender period, confirm which round it is. The same 12 days mean one thing in a first round and another after a failed one.
If the three-bidder threshold goes
The video adds one more thing at the end. On November 11, 2025, the Public Construction Commission gave advance notice of an amendment to Article 48 of the Government Procurement Act that would remove the rule requiring three or more qualified bidders before bids can be opened. The accompanying measures included publishing annual procurement plans, public inspection of tender documents and moderately longer tender periods. On March 7, 2026, the commission said the amendment would not go to the Legislative Yuan this session, and the three-bidder rule would stay as currently written.
This matters for your table. While the three-bidder threshold stands, the column “earlier failed round?” can sort out the second explanation. Remove the threshold and a first opening can be awarded to one bidder. That column loses its power to tell cases apart, and you’ll need a different column to do the sorting.
Open the Government e-Procurement System, pick ten Pingtung County Government award notices with a bidder count of 1, and copy the seven fields above. Then write one line beside each row: which of the three explanations can you set aside for now, and which box lets you do it?
Your turn
On the Government e-Procurement System, find two Pingtung County Government award notices that each drew one bidder: one with a transmission count of 01, one above 01. Write one sentence explaining each. Which sentence can draw on Article 48, paragraph 2? Which can’t? Which box does your reason rest on?
Show hint
For the one above 01, first find the no-award notice with the same case number and read the reason. Then check the tendering-method field on both.
Pick a case with one bidder and, using the same procurement category, find a similar case in another county to compare bidder counts. Which three conditions do you use to judge that the two are “alike enough”? Which one is hardest to meet?
Show hint
Choose from procurement value bracket, tendering method, contract period and procurement category, and write down why you dropped the others.
Suppose the amendment removing the three-bidder limit passes. Which column in your table loses its power to tell cases apart? Of the three accompanying measures the Public Construction Commission proposed, pick the one you think best fills that gap, and explain what new trace it would leave.
Show hint
Reread how United Daily News and Business Today describe the measures: annual procurement plans, public inspection of tender documents, longer tender periods. Tender notices carry a field asking whether a public inspection was held.
Sources
- Government e-Procurement System: tender search (switch to award search; filter by agency name) ↗
- Government e-Procurement System: procurement category search (choose award notices or no-award notices) ↗
- Government Procurement Act, Article 48 (Laws and Regulations Database) ↗
- Enforcement Rules of the Government Procurement Act, Article 55 (Laws and Regulations Database) ↗
- Tender Period Standards: Articles 2, 4, 8, 9 and 11 (Laws and Regulations Database) ↗
- United Daily News, November 15, 2025: draft procurement amendment would drop the three-bidder rule for opening bids ↗
- Business Today, March 9, 2026: Public Construction Commission says the amendment will not go to the Legislative Yuan this session ↗